{"id":810,"date":"2026-01-28T09:08:18","date_gmt":"2026-01-28T08:08:18","guid":{"rendered":"https:\/\/karabit.hr\/?p=810"},"modified":"2026-01-28T09:08:37","modified_gmt":"2026-01-28T08:08:37","slug":"povrsinska-miniranja-2026-na-obilaznici-novog-vinodolskog","status":"publish","type":"post","link":"https:\/\/karabit.hr\/en\/povrsinska-miniranja-2026-na-obilaznici-novog-vinodolskog\/","title":{"rendered":"Surface Blasting 2026 Novi Vinodolski Bypass"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Following the successful breakthrough of both the service and main tubes of the <strong>Zagori tunnel<\/strong> in 2024, Karabit continues in 2025 with blasting works on the section of the route from the Selce interchange to the Zagori tunnel, and in 2026 surface blasting is being carried out on the construction section of the <strong>Povile roundabout<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">All operations are part of the project for the <strong>construction of the Selce \u2013 Novi Vinodolski<\/strong> of the future A7 highway, Rupa\u2013Rijeka\u2013\u017duta Lokva.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Karabit was contracted by the main contractor <strong>Kolektor SPG<\/strong>, as part of the investment by Hrvatske autoceste.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<figure class=\"wp-block-gallery columns-1 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/karabit.hr\/wp-content\/uploads\/2026\/01\/260128_web-1-1-1024x576.jpeg\" alt=\"\" data-id=\"811\" data-full-url=\"https:\/\/karabit.hr\/wp-content\/uploads\/2026\/01\/260128_web-1-1.jpeg\" data-link=\"https:\/\/karabit.hr\/2026\/01\/28\/povrsinska-miniranja-2026-na-obilaznici-novog-vinodolskog\/260128_web-1-1\/\" class=\"wp-image-811\" srcset=\"https:\/\/karabit.hr\/wp-content\/uploads\/2026\/01\/260128_web-1-1-1024x576.jpeg 1024w, https:\/\/karabit.hr\/wp-content\/uploads\/2026\/01\/260128_web-1-1-300x169.jpeg 300w, https:\/\/karabit.hr\/wp-content\/uploads\/2026\/01\/260128_web-1-1-768x432.jpeg 768w, https:\/\/karabit.hr\/wp-content\/uploads\/2026\/01\/260128_web-1-1-1536x864.jpeg 1536w, https:\/\/karabit.hr\/wp-content\/uploads\/2026\/01\/260128_web-1-1.jpeg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/li><\/ul><\/figure>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Nakon uspje\u0161no izvedenog proboja servisne i glavne cijevi tunela Zagori tijekom 2024., Karabit u 2025. nastavlja s izvo\u0111enjem radova miniranja na dijelu trase od \u010dvora Selce do tunela Zagori,&nbsp; a 2026. povr\u0161inska se miniranja izvode na dijelu izgradnje rotora Povile. Svi su radovi dio projekta izgradnje dionice Selce \u2013 Novi Vinodolski budu\u0107e autoceste A7 Rupa\u2013Rijeka\u2013\u017duta [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":812,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-810","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aktualnosti"],"acf":[],"_links":{"self":[{"href":"https:\/\/karabit.hr\/en\/wp-json\/wp\/v2\/posts\/810","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/karabit.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/karabit.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/karabit.hr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/karabit.hr\/en\/wp-json\/wp\/v2\/comments?post=810"}],"version-history":[{"count":3,"href":"https:\/\/karabit.hr\/en\/wp-json\/wp\/v2\/posts\/810\/revisions"}],"predecessor-version":[{"id":815,"href":"https:\/\/karabit.hr\/en\/wp-json\/wp\/v2\/posts\/810\/revisions\/815"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/karabit.hr\/en\/wp-json\/wp\/v2\/media\/812"}],"wp:attachment":[{"href":"https:\/\/karabit.hr\/en\/wp-json\/wp\/v2\/media?parent=810"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/karabit.hr\/en\/wp-json\/wp\/v2\/categories?post=810"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/karabit.hr\/en\/wp-json\/wp\/v2\/tags?post=810"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}